Otepi, S.A.

 

Bulletin Apuntes Otepi. Year VII. N° 28 September-October 2008Contact us
 
  OTEPI Iberia signs contract for new combined cycle power isle

OTEPI Iberia repeats business with its client Empresarios Agrupados. On this occasion the assignment is the detail engineering for the development of  the Power Isle of the Combined Cycle central unit in the CC Port Barcelona


The Port Barcelona combined cycle has a 2x109FB-type (single axle) configuration with an approximate power generation of 2x400 MW, using 9FB-type gas turbines, steam turbine, alternators, heat recovery boilers (HRSG) and a distributed control system (GE-DCS), supplied by General Electric (GE/EA). The design of the central unit is based on that of the GE 109FB standard plant.

“We are proud of having formed such an successful relationship with this important Spanish client and we believe this is only the beginning of a long-lasting and fruitful relationship”, comments Lorena Velásquez, the Project Manager.


Empresarios Agrupados is an important Spanish engineering and construction firm with ample experience in the design and building of electric energy generating plants, including those that use combined cycle technology.


Otros artículos de esta sección:



Send us your comments to apuntes@otepi.com.ve

Otepi S. A.
Legal deposit: pp200403CS343. ISSN: 1690-7027
All rights reserved.
Producción: Unidad de Desarrollo de Negocios

Visit our Web page: www.otepi.com.ve

Contact us